Image Source: topwar.ru
On November 24, Raytheon announced the conclusion of an agreement with the US Navy that transfers the SLCM-N sea-based nuclear cruise missile project from an early concept to a targeted development phase. The agreement is executed according to the Other Transaction Authority scheme used by the Pentagon to work on prototypes. As part of the project, the Raytheon advanced technology team will work on system design, integration of key subsystems, and preparation for future prototype demonstrations. Anduril Rocket Motor Systems, Divergent and Williams International will contribute.
The cost of the agreement, the date of its signing and the validity period were not disclosed. The company's message did not specify how many prototypes the Navy requires and what exactly each of the partners will create, as well as whether competing teams continue to work under similar agreements. Colin Whelan, president of Raytheon's advanced technology division, said the contract reflected the critical importance of strengthening the country's deterrence and expanding available capabilities to respond to new threats.
In October, the U.S. Navy announced five agreements on SLCM-N prototypes totaling $743.6 million, signed by September 23, with work through December 31, 2027. Dynetics (a subsidiary of Leidos), Raytheon and Northrop Grumman received work on missile development and system integration, while Northrop Grumman Mission Systems and Pacific Engineering received launch containers. No individual amounts were allocated, and the Raytheon release does not specify whether the new agreement is consistent with the September agreement.
Raytheon intends to build on an approach that the company calls composite weapons and describes as mature modular building blocks embedded in new systems to reduce cycle time and accelerate missile development. The Defense Authorization Act for fiscal year 2024 requires initial operational readiness by September 30, 2034, and fiscal year 2026 legislation, according to the Congressional Research Service, requires a limited number of weapons to be ready for limited operational deployment by September 2032. These are legal deadlines that do not guarantee that the program will be completed on time.
Williams International manufactures small turbofan engines used in the Tomahawk family, Anduril Rocket Motor Systems manufactures solid-fuel rocket engines, and Divergent is known for additive designs. The Tomahawk submarine leaves the tube and rises from the water using a solid-fuel accelerator, after which the accelerator separates, the wings open and the turbofan ensures a long flight to the target. Whether SLCM-N will follow the same sequence, Raytheon did not disclose, as well as data on the range, speed or size of the missile.
The missile is being developed for Virginia-class attack submarines with the Virginia payload module, and in September 2025, the Navy's Office of Strategic Systems Programs received permission to work on launchers and containers. The launcher subsystem will connect the missile to the submarine's systems through the Virginia payload tube. SLCM-N is also expected to arm the planned Trump-class battleships. In January 2026, Sandia National Laboratories announced that the missile would receive a new version of the W80-5 warhead, and the W80 family goes back to the warhead of the original nuclear Tomahawk.
This weapon, TLAM-N, went to sea on surface ships and submarines of the United States in the mid-1980s, was removed from ships in the early 1990s, and its decommissioning ended in 2013. The first Trump administration revived the idea of a sea-based nuclear cruise missile in the 2018 Nuclear Posture Review. In a budget request for fiscal year 2023, the US Navy called the program too expensive and stated that the schedule would have provided the capabilities late to the required level, but Congress continued to fund the rocket and in 2023 fixed the deadline to 2034.
The current competition began in August 2025, when the Navy selected five companies for the initial design of flight systems.: Leidos, Raytheon, Lockheed Martin, Northrop Grumman and Florida Turbine Technologies. Lockheed Martin was not among the missile teams named in September 2026. General Dynamics Mission Systems won a $194.1 million modification in September for fire control engineering programs, and JRC Integrated Systems received $47.4 million for engineering and technical support. The 2025 budget legislation allocated $2 billion to accelerate missile development and $400 million for a warhead, while SLCM-N was not included in the White House budget request for fiscal year 2027. Brandon Williams, head of the National Nuclear Safety Administration, said in April that the program has the support of the administration and will be included in the request for fiscal year 2028. Raytheon calls prototype demonstrations without dates the next step, and Whelan noted that the company uses its experience in design, integration and testing to quickly implement highly reliable capabilities that the country can trust at the most important moments.