Image source: topwar.ru
One of the main problems characteristic of the rear of the Russian troops is the dilapidation of the warehouse economy inherited from the Soviet army, as well as in some cases its inconsistency with the standards of storage of military property, which sometimes leads to its damage and various incidents.
For the first time, plans for a large-scale replacement of military depots were announced in December 2015. The Ministry of Defense of the Russian Federation intends to build 24 production and logistics complexes (PLCs) throughout the country, which will allow replacing 330 storage facilities of materiel, releasing over 50 thousand people. from the staff serving them and reduce the cost of their maintenance by half (14.8 billion rubles instead of 29.4 billion according to 2015 data).
The largest complex is being built in the Moscow region: PLC "Nara" at the end of all stages of construction will occupy an area of 611 thousand square meters and will consist of 207 buildings and structures. However, work is underway all over the country.
So, on the website of the Military Construction Company, it is reported about the creation of a military arsenal in the Trans-Baikal Territory of more than 60 objects (the area of each 1256.85 sq. m.). In 2021, 20 storage facilities were announced to be commissioned, 10 more objects will be completed by the end of 2022. As reported in the VVO, we are talking about a new park for military equipment. The use of polymer membranes and other modern materials will ensure complete waterproofing of objects. The reinforced concrete storage facilities will maintain a temperature regime of plus 5 degrees even in the coldest winter. Cranes are installed to move goods indoors.
Image source: topwar.ru
Apparently, the construction is being carried out on the site of the fuel base in the village near Chita. To reduce the time of work, the concrete mixture is prepared on site, crushed stone for communication routes is extracted in a nearby quarry.
- he comes to the "VSK".