Войти

On September 29, the corvette "Brave"will be laid at the Amur Shipbuilding Plant

1761
0
+2
Image source: http://www.aolgm.ru/

The corvettes are designed to operate in the sea zone and fight against enemy surface ships and submarines, the Russian Defense Ministry said

MOSCOW, September 24. /TASS/. The multi-purpose corvette of the near sea zone of the project 20380 "Brave" will be laid at the Amur Shipbuilding Plant (part of the United Shipbuilding Corporation, USC) on September 29. This was reported to journalists in the Ministry of Defense of the Russian Federation.

"The multi-purpose corvette of the project 20380 "Brave" will be solemnly laid down at the Amur Shipbuilding Plant. The date of laying the corvette - September 29 - was set by the commander - in-chief of the Russian Navy, Admiral Nikolai Evmenov," the message says.

The ministry noted that the corvettes of the 20380 project are capable of solving a wide range of tasks as part of heterogeneous fleet groups and singly. They are designed for operations in the sea zone and fighting against enemy surface ships and submarines, as well as for artillery support of amphibious assault and patrolling the area of responsibility.

It is expected that representatives of the Ministry of Defense of the Russian Federation, the command of the Navy and the Pacific Fleet, the USC and the Almaz Central Design Bureau, as well as the government of the Khabarovsk Territory and the administration of Komsomolsk-on-Amur will take part in the laying ceremony.

The ships of the 20380 projects were developed by the Almaz Central Marine Design Bureau. Currently, seven corvettes of the project 20380 are serving in the Russian Navy, four more are under construction. The contracts provide for the construction of four more ships of the series at the Northern Shipyard. According to the revised project 20385, one ship was built, two more are being built. According to the improved project 20386, the corvette Mercury is being built at the Northern Shipyard.

Depending on the modification of the ship, the armament of the project 20380 corvettes consists of anti-ship missile launchers "Kalibr-NK" or "Uran", an anti-aircraft missile system "Kortik-M" or "Poliment-Redut", two AK-630M artillery installations of 30 mm caliber, an A-190 artillery installation of 100 mm caliber, as well as two torpedo tubes of the Package complex of 330 mm caliber. The Ka-27 helicopter can be based on the ship.

The rights to this material belong to
The material is placed by the copyright holder in the public domain
  • The news mentions
Do you want to leave a comment? Register and/or Log in
ПОДПИСКА НА НОВОСТИ
Ежедневная рассылка новостей ВПК на электронный почтовый ящик
  • Discussion
    Update
  • 12.07 22:00
  • 9614
Without carrot and stick. Russia has deprived America of its usual levers of influence
  • 12.07 19:49
  • 1
Жертвы Волыни – политический инструмент
  • 12.07 17:00
  • 3
Главе правительства РФ представили полностью отечественный региональный пассажирский самолет Ил-114-300
  • 12.07 15:46
  • 319
Космонавтика Илона Маска
  • 12.07 14:07
  • 0
Армия учится только на своих ошибках – и в ходе ведения боевых действий
  • 12.07 11:48
  • 2759
Как насчёт юмористического раздела?
  • 12.07 10:56
  • 1
«Прорывается через противоракетный щит противника»: США запустили серийное производство ОТР PrSM
  • 12.07 10:51
  • 1
В США рассказали о вытеснении России с оружейного рынка
  • 12.07 10:47
  • 1
Срочную переброску Китаем в Иран систем ПВО объяснили устареванием российских С-300ПМУ2
  • 11.07 20:19
  • 37
МС-21 готовится к первому полету
  • 11.07 20:01
  • 17
Российскую лазерную систему ПВО применят против украинского «Лютого»
  • 11.07 08:59
  • 0
Бойтесь данайцев, дары приносящих
  • 11.07 02:40
  • 6
ISW: Россия массово закупит мотоциклы для наступательных операций
  • 10.07 17:48
  • 103
Обзор программы создания Ил-114-300
  • 10.07 17:42
  • 57
CEO of UAC Slyusar: SSJ New tests with Russian engines will begin in the fall - TASS interview