Войти

UEC proposes to use prefabricated power plants based on NK-37 for an industry order

170
0
0
Image source: Объединенная двигателестроительная корпорация

The installation of such modular gas turbine power plants is carried out three times faster than stationary facilities.

UEC Engineering (part of the United Engine Corporation of Rostec State Corporation) has proposed the use of prefabricated gas turbine power plants based on the NK-37 engine in energy-deficient regions of Russia. This solution will allow the construction of modular gas turbine power plants three times faster than stationary facilities that are being built according to individual projects. It may also become a standard for an industry order, the formation of which is being discussed by the Ministry of Energy of the Russian Federation.

At the Goszakaz-2026 forum and exhibition, UEC Engineering proposed including prefabricated gas turbine power plants based on NK-37 in the line of equipment designed to create a federal mobile power reserve. This reserve will consist of electricity generation equipment that can be moved to energy-deficient regions of Russia.

The NK-37 engine, developed and manufactured by the Samara-based ODK-Kuznetsov enterprise, combines high efficiency, reliability and low operating costs. On its basis, UEC Engineering is creating a fundamentally new line of energy equipment — pre-built gas turbine power plants with a capacity of 25 MW and 32 MW. The equipment is capable of running on natural gas or diesel fuel, is adapted to extreme climatic conditions and requires minimal site preparation. Due to the high specific power and compact dimensions, modular GTES can be deployed in the shortest possible time. Thus, the installation of a prefabricated power plant according to a standard project takes 60 days. Stationary GTES on an individual project require up to 180 days.

"UEC offers effective solutions for the formation of an energy supply ecosystem. The industry order is a mechanism for the development of production capacities of enterprises. It will allow attracting investments in R&D and introducing new products to the market. We consider it important to unify customer requirements in order to create standard technical solutions. This will make it possible to switch to mass production, reduce project implementation time and eliminate expensive individual improvements. Regarding the formation of the federal mobile capacity reserve, we are ready to offer our solution based on the NK-37 engine to the market," said Andrey Vorobyov, General Director of UEC Engineering.

The decision to create a federal mobile capacity reserve is being considered as part of the formation of an industry order in the energy sector. This is part of a new government policy to ensure technological sovereignty and a long-term planning tool that should link energy development plans with government support measures for manufacturers of domestic equipment.

UEC Engineering is a comprehensive supplier of high-tech gas pumping and energy equipment to UEC enterprises. The company made its proposals within the framework of the round table "Industry Order in the electric power industry as a tool for ensuring infrastructural development and achieving technological sovereignty," organized by the Russian Ministry of Energy. The event took place within the framework of the XXI forum-exhibition "Goszakaz-2026", which takes place in Moscow from May 13 to May 15.

The rights to this material belong to
The material is placed by the copyright holder in the public domain
  • The news mentions
Страны
Компании
Do you want to leave a comment? Register and/or Log in
ПОДПИСКА НА НОВОСТИ
Ежедневная рассылка новостей ВПК на электронный почтовый ящик
  • Discussion
    Update
  • 18.05 03:41
  • 2
BARS units will be created in Udmurtia to protect residents and factories from UAVs
  • 18.05 01:28
  • 1
NATO to put pressure on European arms manufacturers to increase investments (Financial Times, UK)
  • 18.05 01:17
  • 1
Лидер АдГ: Война на Украине представляет угрозу безопасности Германии
  • 18.05 01:03
  • 0
Комментарий к "Fighter Battle: Can Ukraine’s F-16s Defeat Russia’s Su-35 and Su-57?"
  • 17.05 21:45
  • 0
Комментарий к "Боевые самолеты России превзошли вооружение НАТО"
  • 17.05 19:59
  • 4
ОАК передала Минобороны России партию самолетов Су-57 с обновленным комплексом вооружения
  • 17.05 18:41
  • 6
В России появится собственный 90-нанометровый литограф
  • 17.05 13:01
  • 15822
Without carrot and stick. Russia has deprived America of its usual levers of influence
  • 17.05 04:04
  • 0
Комментарий к "ЗРК «Тор-М2» - в центре внимания западной военной прессы"
  • 17.05 02:58
  • 0
Комментарий к "Путина неверно поняли по поводу скорого завершения СВО. Вот что это значит (The Jerusalem Post, Израиль)"
  • 16.05 16:32
  • 1
Турецкий флот пополнил первый танкодесантный корабль нового поколения
  • 16.05 16:21
  • 2
Tactics of using long-range air-to-air guided missiles during their
  • 16.05 15:53
  • 1
Боевые самолеты России превзошли вооружение НАТО
  • 16.05 15:13
  • 1
Путин рассказал об укреплении технологического суверенитета России
  • 16.05 10:53
  • 2
UEC has introduced a highly efficient method for obtaining nanocomposite coatings for aircraft engine blades