Войти

The preliminary design of the Amur rocket will be completed after evaluating the options for the second-stage engine

1996
0
0
Image source: Фото: Альберт Дзень / ТАСС

The enterprises of the integrated structure of the rocket engine building of Roscosmos are preparing engineering notes on options for building a second-stage carrier engine

MOSCOW, December 15. /tass/. The final deadlines for the completion of the preliminary design of the Amur methane launch vehicle with the return stage will be set after evaluating the options for the second stage engine. This was reported to TASS by the press service of the Progress Rocket and Space Center (RCC) (part of Roscosmos).

"The final deadline for the completion of the preliminary design will be set after a commission evaluation of the variants of the second-stage engine of the Amur launch vehicle," the press service noted.

As specified in the RCC "Progress", now the enterprises of the integrated structure of the rocket engine building of Roscosmos are preparing engineering notes on options for building the engine of the second stage of the Amur launch vehicle. "The purpose of these works is to obtain the most promising engine - optimal in design and the most energy efficient," they added.

At the end of August, the press service of the Progress RCC informed TASS that the preliminary design of the Amur methane launch vehicle with a returnable stage was sent to the main research institutes of the rocket and space industry. Then the company noted that the majority of research institutes issued positive conclusions on the materials of the draft project. At the same time, they did not rule out the possibility of increasing the terms of its development due to the need for its completion.

In October last year, Roscosmos and the Progress RCC signed a contract for the development of a preliminary design of a space rocket complex with the first Russian reusable rocket powered by methane "Amur". The rocket will receive a returnable first stage and will be launched from the Vostochny cosmodrome in the Amur Region.

The rights to this material belong to
The material is placed by the copyright holder in the public domain
  • The news mentions
Do you want to leave a comment? Register and/or Log in
ПОДПИСКА НА НОВОСТИ
Ежедневная рассылка новостей ВПК на электронный почтовый ящик
  • Discussion
    Update
  • 26.11 01:10
  • 4
Истребители Су-30 получат новые двигатели в 2025 году
  • 26.11 01:10
  • 5949
Without carrot and stick. Russia has deprived America of its usual levers of influence
  • 26.11 00:56
  • 12
Стало известно о выгоде США от модернизации мощнейшего корабля ВМФ России
  • 25.11 20:34
  • 0
О модернизации МПЛА и РПКСН
  • 25.11 19:08
  • 3
ГУР Украины утверждает, что удар по заводу Южмаш якобы наносился не «Орешником», а ракетным комплексом «Кедр»
  • 25.11 18:44
  • 2
Украинских пограничников вооружили гаубицами образца 1941 года
  • 25.11 17:52
  • 3
  • 25.11 17:49
  • 2
Белоруссия выиграла тендер на модернизацию 10 истребителей Су-27 ВВС Казахстана
  • 25.11 12:12
  • 0
«Самый лучший» польский ВПК
  • 25.11 11:47
  • 41
Какое оружие может оказаться эффективным против боевых беспилотников
  • 25.11 07:37
  • 2
«Синоним лжи и неоправданных потерь». Командующего группировкой «Юг» сняли с должности
  • 25.11 05:29
  • 0
О БПК проекта 1155 - в свете современных требований
  • 25.11 04:00
  • 0
О крейсерах проекта 1164 "Атлант" - в свете современных требований.
  • 25.11 03:48
  • 1
Ульянов заявил, что Франция и Британия заплатят за помощь Украине в ударах по РФ
  • 25.11 03:33
  • 1
Путин подписал закон о ратификации договора о военно-техническом сотрудничестве с Южной Осетией