Войти

Borisov: plans to create a twin-engine version of the upgraded Il-96 remain

Sections: Air, New development
3639
0
0
Image source: © Пресс-служба ОАК

According to the Deputy Prime Minister, the Il-96-300 aircraft are being assembled at the Voronezh Aircraft Factory

TYUMEN, September 17. /TASS/. Plans to create an upgraded version of the Il-96 with two engines instead of four remain, Russian Deputy Prime Minister Yuri Borisov told reporters on the sidelines of the Tyumen Oil and Gas Forum.

"Yes, it is (a twin-engine version of the aircraft-approx. TASS) is considered if there are works carried out on the PD-35 engine on time, " Borisov said. - You know that the PD-35 engine is being developed in Perm as part of the creation of a Russian-Chinese wide-body aircraft. The presence of this engine will give a new life to the aircraft (Il-96-approx. TASS). This is one of the branches on which we, apparently, will go. The aircraft is very successful from the point of view of the overall design." The Deputy Prime Minister noted that the aircraft is now equipped with four PS-90A engines. Replacing the engines will require a large-scale modernization and redesign of the wing, he added.

According to Borisov, the Il-96-300 aircraft are currently being assembled at the Voronezh Aircraft Manufacturing Plant (VASO), four aircraft are being built at the production site.

Il-96-300 - a wide-body long-haul aircraft, the first flight of which took place in 1988. Now the aircraft is operated only by a special flight detachment "Russia", commercial airlines of the Russian Federation do not use it. Also, several Il-96s are used by the Kuban national airline Cubana.

At the moment, PJSC " Il " is creating the Il-96-400M-a version of the Il-96-400 for civil aviation with a fuselage lengthened by 9.35 m, as well as a new modernized digital flight and navigation complex that allows operating the aircraft without restrictions in any region of the globe. It is planned to build a prototype in 2021.

As previously reported by the head of Rostec (which includes the United Engine Corporation) Sergey Chemezov, the PD-35 engine will be ready by 2025-2026.

The rights to this material belong to
The material is placed by the copyright holder in the public domain
  • The news mentions
Do you want to leave a comment? Register and/or Log in
ПОДПИСКА НА НОВОСТИ
Ежедневная рассылка новостей ВПК на электронный почтовый ящик
  • Discussion
    Update
  • 26.08 20:21
  • 3
Охраняющие Москву зенитные ракетно-пушечные комплексы получили новые ракеты
  • 26.08 19:12
  • 3
Russian S-400 air defense systems have achieved unprecedented target destruction thanks to a new over-the-horizon targeting method (Military Watch Magazine, USA)
  • 26.08 09:44
  • 2
Командующий ВВС заявил о почти полном обновлении парка авиации России
  • 26.08 07:10
  • 2
Sweden will radically change the methods of espionage in Russia
  • 26.08 05:28
  • 0
О современном воздушном бое.
  • 26.08 03:55
  • 1
Путин анонсировал атомный мегапроект: Россия построит АЭС на 30 ГВт
  • 26.08 03:40
  • 1
Эксперт сообщил о применении ПО от Palantir для планирования операций ВСУ
  • 26.08 03:40
  • 1
ОДКБ не взаимодействует с Арменией в военной сфере, заявили в МИД
  • 26.08 03:32
  • 1
Финляндия заказала дронов на €14 млрд
  • 26.08 03:29
  • 2
«Уралдронзавод» представил способный уничтожить здание беспилотник «Упырь-К»
  • 26.08 03:23
  • 1
Временное управление на критически важных объектах инфраструктуры не предполагает национализацию
  • 25.08 13:26
  • 4
Garage creative
  • 25.08 09:01
  • 16393
Without carrot and stick. Russia has deprived America of its usual levers of influence
  • 25.08 02:01
  • 1
Why did a US aircraft with the latest electronic warfare system make its debut over the Baltic
  • 25.08 01:56
  • 1
The latest KN-30 missiles from the DPRK can carry warheads weighing up to 2.5 and 4.5 tons.