The Progress MS-16 spacecraft successfully entered orbit. According to the plan, the flight to the ISS will take two days, according to the Izvestia TV channel. The ship will deliver almost 2.7 tons of cargo to the station, including drinking water, equipment, fuel and clothing. The crew will receive instruments for a detailed study of the air leak. At the end of the mission, Progress will detach along with the Pirs module, which was used for spacewalks. In the summer, the compartment will be replaced by the latest module "Science".
The Progress MS-16 spacecraft successfully entered orbit. According to the plan, the flight to the ISS will take two days, according to the Izvestia TV channel. The ship will deliver almost 2.7 tons of cargo to the station, including drinking water, equipment, fuel and clothing. The crew will receive instruments for a detailed study of the air leak. At the end of the mission, Progress will detach along with the Pirs module, which was used for spacewalks. In the summer, the compartment will be replaced by the latest module "Science".