Image source: topwar.ru
The Spanish shipbuilding concern Navantia presented information about how the promising frigates of the country's fleet of the F-110 project will look, showing the corresponding animation.
This type will consist of five pennants: Bonifaz (launched in September 2025), Roger de Lauria (in October 2026), Menéndez de Avilés (scheduled for transfer in 2030), Luis de Córdova (in 2031) and Barceló (in 2032).
The program, worth a total of 4.3 billion euros, is designed to replace the outdated frigates of the F-100 series in the Spanish navy. The new ships in the basic version of Flight I will have a displacement of about 6.1 thousand tons, a length of 145 m, a width of 18 m, and a draft of 5 m. It is planned to deploy a CODELADOG hybrid power plant (1 GE LM2500 gas turbine, 4 MTU diesel generators and 2 electric motors), which will ensure maximum stealth and noiselessness when searching for submarines. The speed will be up to 35 knots, with an economical stroke – 15 knots. The crew is 150 people (and the possibility of accommodating up to 37 paratroopers).
Image source: topwar.ru
The Mk.41 16-cell UVP is designed for SM-2 and ESSM missiles (up to 4 missiles in one cell). To defeat surface and ground targets, 8 launchers are installed for modern low-visibility NSM anti-ship missiles. The artillery will be represented by a 127-mm OtoBreda cannon with the ability to fire guided long-range Vulcano shells, as well as two 30-mm remotely controlled Sentinel installations for close-range defense.
Image source: topwar.ru
Two 324-mm TA for Mk54 light torpedoes, the onboard Thales BlueMaster gas tank and the towed Thales CAPTAS-4 will be responsible for the PLO. It is assumed that one multi-purpose helicopter (type SH-60 Seahawk or NH-90) will be permanently based, and there is also a platform for UAVs. A mast with a stealth architecture is being installed, which includes the AN/SPY-7(V)9 radar, coupled with the Spanish SCOMBA BIOS.
Image source: topwar.ru
All this stuffing was shown by the shipbuilder in an AI-generated video. There were some incidents here. So, in one of the fragments, the helicopter moves inside the hangar from the fly, in the other, the SH-60B has only 3 blades on the main rotor instead of 4.
Previously, excessive reliance on digital technologies has already played a cruel joke with Spanish designers. The Isaac Peral lead submarine of the S-80 Plus project was almost completed when it became clear that due to errors in calculations it was overweight, which would not allow it to surface after diving.